Configuring the Cisco TelePresence Management Server
Cisco TelePresence Management Suite Installation and Getting Started Guide
Page 30 of 70
Complies with FCC15B Class A
Unpacking
To avoid damage to the unit during transportation, the Cisco TelePresence Management Server
Appliance is delivered in a special shipping box which contains the following components:
rack-ears, screws and screwdriver
cables:
•
power cable
•
Ethernet cable
Cisco TelePresence Management Server Appliance
Installation site preparations
Make sure that the Cisco TelePresence Management Server Appliance is accessible and that all
cables can be easily connected.
For ventilation, leave a space of at least 10cm (4 inches) behind the rear panel and 10cm (4
inches) in front of the front panel.
It is recommended that the room in which you install the Cisco TelePresence Management Server
Appliance have an ambient temperature between 0°C a nd 35°C (32°F and 95°F) and between
10% and 90% non-condensing relative humidity.
Do not place heavy objects directly on top of the Cisco TelePresence Management Server
Appliance.
Do not place hot objects directly on top, or directly beneath the Cisco TelePresence Management
Server Appliance.
Use a grounded AC power outlet for the Cisco TelePresence Management Server Appliance.
Rack mounting (optional)
The Cisco TelePresence Management Server Appliance comes with rubber feet for standalone
installation and brackets for mounting in standard 19” racks.
Before starting the rack mounting, ensure the Cisco TelePresence Management Server Appliance is
placed securely on a hard flat surface.
1. Disconnect the AC power cable.
2. Set up the mounting space in accordance with the ‘Installation site preparations’ above.
3. Attach the brackets to the Cisco TelePresence Management Server Appliance on both sides of the
unit using the 8 screws provided.
4. Insert the Cisco TelePresence Management Server Appliance into a 19” rack, and secure it at the
front using the four screws provided.