Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Installing the Server In a Rack
Step 1
With the server pushed fully into the rack, slide the CMA tab of the CMA arm that is farthest from the
server onto the end of the stationary slide rail that is attached to the rack post (see
). Slide
the tab over the end of the rail until it clicks and locks.
Step 2
Slide the CMA tab that is closest to the server over the end of the inner rail that is attached to the server
(see
). Slide the tab over the end of the rail until it clicks and locks.
Step 3
Pull out the width-adjustment slider that is at the opposite end of the CMA assembly until it matches the
width of your rack (see
).
Step 4
Slide the CMA tab that is at the end of the width-adjustment slider onto the end of the stationary slide
rail that is attached to the rack post (see
). Slide the tab over the end of the rail until it clicks
and locks.
Step 5
Open the hinged flap at the top of each plastic cable guide and route your cables through the cable guides
as desired.
Figure 3-32
Attaching the Cable Management Arm to the Rear of the Slide Rails
1
CMA tab on arm farthest from server and end
of stationary outer slide rail
3
CMA tab on width-adjustment slider and end
of stationary outer slide rail
2
CMA tab on arm closest to the server and end
of inner slide rail attached to server
4
Rear of server