3-27
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Installing the CDEs
Figure 3-24
Locking the Rev. B Rails
Step 6
Hang the hooks of the rails on the rack holes and press down so they are completely seated. If necessary,
secure the rails with screws.
Figure 3-25
Attaching the Rev. B Rack Rails to the Rack
Step 7
to mount the four ends, extending the rails as necessary.
1
Outer rail assembly
2
Middle rail assembly
3
Locking tab
209588
2
1
3
1
Rack
2
Rail hooks
3
Screws
1
2
209589
3
1
2