3-31
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Chapter 3 Installing the Content Delivery Engines
Unpacking and Inspecting the Server
Unpacking and Inspecting the Server
Caution
When handling internal server components, wear an ESD strap and handle modules by the carrier edges
only.
Tip
Keep the shipping container in case the server requires shipping in the future.
Note
The chassis is thoroughly inspected before shipment. If any damage occurred during transportation or
any items are missing, contact your customer service representative immediately.
Step 1
Remove the server from its cardboard container and save all packaging material.
Step 2
Compare the shipment to the equipment list provided by your customer service representative. Verify
that you have all items.
Step 3
Check for damage and report any discrepancies or damage to your customer service representative. Have
the following information ready:
•
Invoice number of shipper (see the packing slip)
•
Model and serial number of the damaged unit
•
Description of damage
•
Effect of damage on the installation
Preparing for Server Installation
This section provides information about preparing for server installation, and it includes the following
topics:
•
Installation Guidelines, page 3-31
•
•
Equipment Requirements, page 3-33
•
Slide Rail Adjustment Range, page 3-33
Installation Guidelines
Warning
To prevent the system from overheating, do not operate it in an area that exceeds the maximum
recommended ambient temperature of: 35° C (95° F).
Statement 1047