13-23
Catalyst 3750-E and 3560-E Switch Software Configuration Guide
OL-9775-08
Chapter 13 Configuring VLANs
Configuring VLAN Trunks
Figure 13-3
Load Sharing by Using STP Port Priorities
Note
If your switch is a member of a switch stack, you must use the
spanning-tree
[
vlan
vlan-id
]
cost
cost
interface configuration command instead of the
spanning-tree
[
vlan
vlan-id
]
port-priority
priority
interface configuration command to select an interface to put in the forwarding state. Assign lower cost
values to interfaces that you want selected first and higher cost values that you want selected last. For
more information, see the
“Load Sharing Using STP Path Cost” section on page 13-24
.
Beginning in privileged EXEC mode, follow these steps to configure the network shown in
.
93370
Switch A
Switch B
Trunk 2
VLANs 3 – 6 (priority 16)
VLANs 8 – 10 (priority 128)
Trunk 1
VLANs 8 – 10 (priority 16)
VLANs 3 – 6 (priority 128)
Command
Purpose
Step 1
configure terminal
Enter global configuration mode on Switch
A.
Step 2
vtp domain
domain-name
Configure a VTP administrative domain.
The domain name can be 1 to 32 characters.
Step 3
vtp mode server
Configure Switch A as the VTP server.
Step 4
end
Return to privileged EXEC mode.
Step 5
show vtp status
Verify the VTP configuration on both Switch A and Switch B.
In the display, check the
VTP Operating Mode
and the
VTP Domain
Name
fields.
Step 6
show vlan
Verify that the VLANs exist in the database on Switch A.
Step 7
configure terminal
Enter global configuration mode.
Step 8
interface gigabitethernet1/ 0/1
Define the interface to be configured as a trunk, and enter interface
configuration mode.
Step 9
switchport trunk encapsulation
{
isl
|
dot1q | negotiate
}
Configure the port to support ISL or IEEE 802.1Q encapsulation or to
negotiate with the neighboring interface. You must configure each end
of the link with the same encapsulation type.
Step 10
switchport mode trunk
Configure the port as a trunk port.
Step 11
end
Return to privileged EXEC mode.
Step 12
show interfaces gigabitethernet1/ 0/1
switchport
Verify the VLAN configuration.
Step 13
Repeat Steps 7 through 11on Switch A for a second port in the switch
or switch stack.
Step 14
Repeat Steps 7 through 11on Switch B to configure the trunk ports that
connect to the trunk ports configured on Switch A.
Содержание Catalyst 3750-E Series
Страница 48: ...Contents xlviii Catalyst 3750 E and 3560 E Switch Software Configuration Guide OL 9775 08 ...
Страница 52: ...lii Catalyst 3750 E and 3560 E Switch Software Configuration Guide OL 9775 08 Preface ...
Страница 1414: ...Index IN 58 Catalyst 3750 E and 3560 E Switch Software Configuration Guide OL 9775 08 ...