S T E P 9
S T E P 9 – C o n t r o l l e r
54
docs.carbide3d.com
55
9.3 Connect Cables
1. Connect the X- and Z-motor cables and the
Z-proximity switch connectors at the back of
the X/Z assembly.
See
Figs. 9-4
and
9-6
.
a. Z-motor is the top motor.
b. Z-proximity switch has a 3-pin connector.
2. Connect the X-, Y-Left, Y-Right, and Z-motor
extension cables, and the X- and Z-proximity
switches at the right end of the gantry.
See
Fig. 9-4
.
Figure 9-4
Figure 9-6
Figure 9-5
3. Check the connection of the Y-Left motor at
the left end of the gantry. Gently pull the cable
connection out of the rail, if necessary.
PRO TIP:
After connecting all labeled cables, any
unlabeled cables can be matched according to
connector type.
9.4 Tidy Cables
1. Use a few zip ties to secure loose cables to
the cable tie mounts
(see
Figs. 9-5
and
9-6)
:
a. At the back of the X/Z assembly.
b. Entering the controller.
c. At Y-Left (router power cable).
NOTE:
A self-adhesive cable tie mount is included
in the kit in case you need it for additional cable
cleanup.
Содержание Shapeoko PRO
Страница 1: ...Shapeoko PRO ASSEMBLY GUIDE...