Section 8. Operation
419
o
Settle:
User input in µS; default of 0 = 500 µS with minimum of 100
µS
o
Fnotch: reciprocal of what we used to call integration time
•
Pipeline differential without reversal with Fnotch=50 Hz or 2 0mS for
our first example: adding this all up you would get 6.00 + .850 + .500 +
20 = 27.35mS. With input reversal, you get to skip the Sync time on the
reverse measurement so it would be coming in at 27.35 + .85 + .500 + 20
= 48.7mS.
•
If in Sequential mode, the above is true except that every new
measurement instruction will be preceded by the Sync (calibration time).
Reps on the same instruction would work as shown in Pipeline mode
where the Sync is only done once.
•
Burst mode is designated by a “-“ prefix on the measurement terminal.
–U1 for example would be used for a burst measurement on U1. When
executed in the datalogger, the Sync+Flush+Fnotch is used for the
first measurement but then the reps are used as the number of samples to
take on that terminal and the Fnotch is the time between
measurements on that terminal.
FIGURE 88: Simplified voltage measurement sequence. Because the
CR6 uses digital signal processing (DSP) to make voltage
measurements, integration and A to D measurement are actually
combined functions. Effective integration time equals 1/fN1, fN1
being the "digital filter" entered into the measurement instruction.
Voltage measurements are made using a 24 bit delta-sigma
A-to-D
(p. 573)
converter with oversampling and digital signal processing (
DSP
(p. 581))
to achieve
an effective resolution approaching 24 bits. Prior to the ampify and settle, a high
impedance programmable-gain instrumentation amplifier (PGIA) amplifies the
signal. See figure
Programmable Gain Input Amplifier (PGIA)
(p. 420).
The
CRBasic program controls amplifier gain and configuration — either single-ended
input or differential input. Internal multiplexers route individual terminals to the
PGIA.
Timing
(p. 210)
of measurement tasks is precisely controlled. The measurement
schedule is determined at compile time and loaded into memory.
Содержание CR6 Series
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 32: ......
Страница 36: ......
Страница 38: ......
Страница 76: ...Section 5 Overview 76 FIGURE 20 Half Bridge Wiring Example Wind Vane Potentiometer ...
Страница 80: ...Section 5 Overview 80 FIGURE 23 Pulse Input Wiring Example Anemometer ...
Страница 136: ......
Страница 251: ...Section 7 Installation 251 FIGURE 46 Running Average Frequency Response FIGURE 47 Running Average Signal Attenuation ...
Страница 454: ...Section 8 Operation 454 FIGURE 104 Narrow Sweep High Noise ...
Страница 459: ...Section 8 Operation 459 FIGURE 106 Vibrating Wire Sensor Calibration Report ...
Страница 535: ...Section 8 Operation 535 8 11 2 Data Display FIGURE 121 CR1000KD Displaying Data ...
Страница 537: ...Section 8 Operation 537 FIGURE 123 CR1000KD Real Time Custom ...
Страница 538: ...Section 8 Operation 538 8 11 2 3 Final Storage Data FIGURE 124 CR1000KD Final Storage Data ...
Страница 539: ...Section 8 Operation 539 8 11 3 Run Stop Program FIGURE 125 CR1000KD Run Stop Program ...
Страница 541: ...Section 8 Operation 541 FIGURE 127 CR1000KD File Edit ...
Страница 542: ...Section 8 Operation 542 8 11 5 PCCard Memory Card Management FIGURE 128 CR1000KD PCCard Memory Card Management ...
Страница 546: ......
Страница 549: ...Section 9 Maintenance Details 549 FIGURE 133 Separate Back Shell from Module FIGURE 134 Disconnect Battery Connector ...
Страница 552: ......
Страница 610: ...Section 11 Glossary 610 FIGURE 137 Relationships of Accuracy Precision and Resolution ...
Страница 612: ......
Страница 648: ......
Страница 650: ......
Страница 688: ......
Страница 689: ......