Section 7. Installation
307
o
SubScan()
/
NextSubScan
introduces potential problems. These are
discussed in
SubScan() / Next Sub
(p. 215).
o
SubScan()
/
NextSubScan
Counts
cannot be larger than
65535
.
o
For
SubScan()
/
NextSubScan
to work, set
Scan()
/
NextScan
Interval
large enough for
Counts
to finish before the next
Scan()
/
NextScan
Interval
.
7.7.14 Measurement: Excite, Delay, Measure
This example demonstrates how to make voltage measurements that require
excitation of controllable length prior to measurement. Overcoming the delay
caused by a very long cable length on a sensor is a common application for this
technique.
Measurement with Excitation and Delay
'This program example demonstrates how to perform an excite/delay/measure operation.
'In this example, the system requires 1 s of excitation to stabilize before the sensors
'are measured. A single-ended measurement is made, and a separate differential measurement
'is made. To see this program in action, connect the following terminal pairs to simulate
'sensor connections:
'
U11
------
U1
'
U12
------
U3
'
U4
------ Ground Symbol
'
'With these connections made, variables VoltageSE and VoltageDiff will equal 2500 mV.
'Declare variables.
Public
VoltageSE
As Float
Public
VoltageDIFF
As Float
'Declare data table
DataTable
(Voltage,True,-1)
Sample
(1,VoltageSE,Float)
Sample
(1,VoltageDIFF,Float)
EndTable
BeginProg
Scan
(5,sec,0,0)
'Excite - delay 1 second - single-ended measurement:
ExciteV
(U11,2500,0)
'<<<<Note: Delay = 0
Delay
(0,1000,mSec)
VoltSe
(VoltageSE,1,mV5000,U1,1,0,15000,1.0,0)
Содержание CR6 Series
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 32: ......
Страница 36: ......
Страница 38: ......
Страница 76: ...Section 5 Overview 76 FIGURE 20 Half Bridge Wiring Example Wind Vane Potentiometer ...
Страница 80: ...Section 5 Overview 80 FIGURE 23 Pulse Input Wiring Example Anemometer ...
Страница 136: ......
Страница 251: ...Section 7 Installation 251 FIGURE 46 Running Average Frequency Response FIGURE 47 Running Average Signal Attenuation ...
Страница 454: ...Section 8 Operation 454 FIGURE 104 Narrow Sweep High Noise ...
Страница 459: ...Section 8 Operation 459 FIGURE 106 Vibrating Wire Sensor Calibration Report ...
Страница 535: ...Section 8 Operation 535 8 11 2 Data Display FIGURE 121 CR1000KD Displaying Data ...
Страница 537: ...Section 8 Operation 537 FIGURE 123 CR1000KD Real Time Custom ...
Страница 538: ...Section 8 Operation 538 8 11 2 3 Final Storage Data FIGURE 124 CR1000KD Final Storage Data ...
Страница 539: ...Section 8 Operation 539 8 11 3 Run Stop Program FIGURE 125 CR1000KD Run Stop Program ...
Страница 541: ...Section 8 Operation 541 FIGURE 127 CR1000KD File Edit ...
Страница 542: ...Section 8 Operation 542 8 11 5 PCCard Memory Card Management FIGURE 128 CR1000KD PCCard Memory Card Management ...
Страница 546: ......
Страница 549: ...Section 9 Maintenance Details 549 FIGURE 133 Separate Back Shell from Module FIGURE 134 Disconnect Battery Connector ...
Страница 552: ......
Страница 610: ...Section 11 Glossary 610 FIGURE 137 Relationships of Accuracy Precision and Resolution ...
Страница 612: ......
Страница 648: ......
Страница 650: ......
Страница 688: ......
Страница 689: ......