2
Product details
Logano G225/Logano plus GB225 - We reserve the right to make any changes due to technical modifications.
7
If the boiler is delivered in sections, you will also require
the following:
– Size 1.2 compression tool (compression tool docu-
mentation)
– Flat board
– White spirit
– Installation kit (accessory)
– Steel hammer and wooden or rubber mallet
– Half-round bastard file
– Screwdriver (Philips and flat head)
– Flat chisel
– Spanners, sizes 13 mm, 19 mm, 24 mm and 36 mm,
and socket size 19 mm
– Support wedge, flat iron
– Cleaning rags and cloth
– Fine emery cloth
– Wire brush
– Lubricating oil
– Spirit level, ruler, chalk, straight edge
– Blanking flange with vent facility (for pressure test)
2.7
Disposal
V
Dispose of boiler packaging in an environmentally
responsible manner.
V
All heating system components that have to be
replaced should be disposed of in an environmentally
responsible manner at an authorised disposal site.