5
Boiler block assembly
Logano G225/Logano plus GB225 - We reserve the right to make any changes due to technical modifications.
23
5.1.9
Installation of the feed pipe and connection
profile
The feed pipe [3] and connecting block [1] are already
fitted if the boiler heat exchanger is supplied pre-
assembled.
V
Secure the feed pipe [3] with gasket in place to the
connecting block using M 8 × 16 screws.
Fig. 18 Installation of the feed pipe to the connecting
block
1
Connecting block
2
Gasket
3
Feed pipe
4
M 8 ×16 screws (brass)
V
Remove the nuts from the threaded studs.
V
Slide gasket [1] over the feed pipe.
V
Slide feeder pipe with connection fitting attached and
gasket [1] in place into the top boiler boss from the
back.
Fig. 19 Installation of the feed pipe and connecting
block
1
Gasket
If there is insufficient space behind the boiler,
insert the feed pipe [3] from the front of the
boiler (not forgetting the gasket for the boiler
boss) before fitting the connection profile [1].
6 720 615 876-18.1RS
4
3
2
1
6 720 615 876-19.1RS
1