Commissioning the heating system
Logano G225/Logano plus GB225 - We reserve the right to make any changes due to technical modifications.
49
7.8
Commissioning report
V
Sign all commissioning work as completed and enter
the relevant date.
Commissioning steps
Page
Readings
taken
Comments
1.
Fill heating system and check all connections for leaks.
41
__________ bar
2.
Operating pressure, building
– Adjust the green field on the pressure gauge
– Vent the heating system
– Adjust the expansion vessel pre-charge pressure (
Æ
observe
expansion vessel documentation)
45
__________ bar
3.
Check the combustion air supply and the flue gas routing
46
4.
Switch on the control unit (
Æ
control unit documentation)
46
5.
Starting the burner (
Æ
burner documentation)
6.
Check and raise the flue gas temperature, if required
47
__________ °C
7.
Adjust the control unit settings to suit the customer's requirements
(
Æ
control unit documentation)
8.
Inform operator, hand over technical documentation
Confirm correct commissioning
Company stamp/signature/date
Inform the customer of the correct fuel and
enter it in the table (
Æ
boiler operating
instructions).
This report lists only the commissioning
steps required for the Logano G225. Details
of the additional commissioning operations
required for the Logano plus GB225 are
given in the enclosed supplement.