5
Boiler block assembly
Logano G225/Logano plus GB225 - We reserve the right to make any changes due to technical modifications.
17
V
Clean the sealing faces of the boiler bosses [1] with a
cloth soaked in white spirit.
V
Evenly coat the boiler boss sealing faces with red lead
putty.
V
Coat the joint lip/groove [2] with adhesive (primer).
Fig. 6
Coating the boiler hubs with red lead putty
1
Boiler boss sealing face
2
Packing groove
5.1.2
Driving boss liners home
V
Clean the boss liners with a cloth soaked in white spirit.
V
Evenly coat the boss liners with red lead putty.
V
Insert the boss liners straight into the upper and lower
hub of the rear section and hammer home securely with
alternate heavy blows.
V
Remove any burrs with a file.
Fig. 7
Driving boss liners home
1
Boss liner in the upper boiler hub
2
Boss liner in the lower boiler hub
2
1
1
6 720 615 876-06.1RS
Leave the two boss liners protruding approx.
30 mm from the boiler boss in each case.
6 720 615 876-07.1RS
2
1