Boiler block assembly
Logano G225/Logano plus GB225 - We reserve the right to make any changes due to technical modifications.
31
Installation of the lower tie bar
V
Secure the lower tie bar with hexagon bolts to the front
section.
Fig. 37 Installation of the lower tie bar
Installation of the thermal insulation
V
Position the thermal insulation over the boiler block.
V
Push the thermal insulation below the boiler block, in
the direction of the arrow.
V
Position the tabs of the thermal insulation [2] in front of
the top crossmember and pull them together with a
spring clip [1].
Fig. 38 Installation of the thermal insulation
1
Spring strap
2
Thermal insulation tabs
6 720 615 876-37.1RS
6 720 615 876-38.1RS