5
Boiler block assembly
Logano G225/Logano plus GB225 - We reserve the right to make any changes due to technical modifications.
36
Installing the cable entry
V
Secure the cable entry to the boiler back panel hole.
V
Slide rubber hood [1] over the temperature sensor and
connect temperature sensor lead.
Fig. 48 Installing the cable entry
1
Rubber sleeve
Insulating the connecting block
V
Cut out the insulating shells of the connecting block at
the indicated and required positions.
Fig. 49 Cutting out the insulating shells
V
Slide the two halves of the insulation box onto the
connection profile.
Fig. 50 Insulating the connection profile.
6 720 615 876-48.1RS
1
6 720 615 876-49.1RS
6 720 615 876-50.1RS