9
Heating system servicing
Logano G225/Logano plus GB225 - We reserve the right to make any changes due to technical modifications.
55
9.5
Servicing and maintenance reports
V
Initial and date the completed service.
The inspection and maintenance reports are also
designed as templates and may be photocopied.
Inspection work
Page
Date:______
Date:______
Date:______
1.
Check the general condition of the heating system
2.
Visual inspection and function check of the
heating system
3.
Check the gas and water-carrying components of
the system for:
– leaks during operation
– leaks
– visible signs of corrosion
– signs of ageing
4.
Check the combustion chamber and the heating
surface for contamination; shutdown the system
for this step
50
5.
Check burner (
Æ
burner documentation)
6.
Check the combustion air supply and flue gas
routing for function and safety
7.
Check the expansion vessel pre-charge pressure
54
8.
Check function of DHW cylinder and sacrificial
anode (
Æ
DHW cylinder documentation)
9.
Check control unit settings (
Æ
control unit
documentation)
10.
Record the final checks of the inspection work,
incl. actual values and test results
Confirmation of correctly completed service
Company
stamp/signature
Company
stamp/signature
Company
stamp/signature
Tab. 13 Inspection report
These logs detail only the servicing and
maintenance operations required for the
Logano G225. Details of the additional
servicing and maintenance operations
required for the Logano plus GB225 are
given in the enclosed supplement.