9
Heating system servicing
Logano G225/Logano plus GB225 - We reserve the right to make any changes due to technical modifications.
57
Condition-based maintenance
Page
Date:______
Date:______
Date:______
1.
Shutting down the heating system
50
2.
Remove and clean hot gas baffels
52
3.
Clean hot gas flues (heating surfaces) and combustion chamber and
afterwards refit hot gas baffels in original positions
52
4.
Check and, if required, replace gaskets/packing cord on the burner and
burner door
52
5.
Start up the heating system
46
6.
Final check of the servicing work
7.
Checking safe and proper functioning in operation
Confirmation of properly completed servicing
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Tab. 15 Service record
Date:______
Date:______
Date:______
Date:______
Date:______
Date:______
Date:______
1.
2.
3.
4.
5.
6.
7.
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Company stamp/
signature
Tab. 16 Maintenance log (continued)