Installing the boiler
Logano G225/Logano plus GB225 - We reserve the right to make any changes due to technical modifications.
43
6.5.2
Connecting the mains power supply and
other components
V
Undo the two screws on the control unit cover and
remove the cover.
Create a permanent mains power connection in
accordance with local regulations.
V
Route all cables through the cable entries to the control
unit and connect in accordance with the wiring
diagram.
Fig. 61 Removing the cover
6.5.3
Fitting a strain relief
Secure all cable runs with cable clamps (standard control
unit delivery):
1. Insert the cable clamp together with the cable from the
top into the slots in the frame.
2. Slide the cable clamp downwards.
3. Press in.
4. Flip the toggle up.
Fig. 62 Securing cables with a cable clamp
Danger: Risk of fire
Hot boiler components may damage cables.
V
Ensure that all cables are routed through
the cableways provided or along the
boiler's insulation material.
6 720 615 876-61.1RS
6 720 615 876-62.1RS