BLACKBERRY RADAR R2 ITE100-1 INSTALLATION GUIDE
DRY VAN, INSULATED TRAILERS (BARN DOORS)—CARGO PERCENTAGE
44
5.
Find and mark the centerline of the trailer’s ceiling.
Tip:
When you are marking the centerline on the trailer, we recommend continuing the
mark along the ceiling for approximately 4” (10 cm).
6.
Place the installation template on the ceiling. Ensure the centerline on the template is
aligned to the centerline on the ceiling. Trace the outline of the template on the ceiling.
Once the tracing is complete, remove the template.
7.
Using the heat gun, raise the temperature of the of the installation surface. For best
adhesion, the recommended installation surface temperature target is 68° F (20° C).
Tip:
In most cold weather conditions, this installation surface temperature target is
sufficient to allow the time to complete the subsequent steps, while remaining warm
enough to improve adhesion for the adhesive.
8.
Locate the 3M VHB Universal Primer ampule that was included in your adhesive kit. Apply
the primer to the installation surface.