BLACKBERRY RADAR R2 ITE100-1 INSTALLATION GUIDE
DRY VAN, INSULATED TRAILERS (BARN DOORS)—CARGO PERCENTAGE
38
2.
Record the module identifier and the asset identifier the module will be paired with. For
your convenience, you may quickly create a record of the module and asset pairings by
removing the partially attached label from the module’s front housing and placing it on
the installation worksheet, next to the asset this module will track.
3.
Find and mark the centerline of the trailer’s ceiling.
Tip:
When you are marking the centerline on the trailer, we recommend continuing the
mark along the ceiling for approximately 4” (10 cm).
4.
Place the installation template on the ceiling. Ensure the centerline on the template is
aligned to the centerline on the ceiling. Trace the outline of the template on the ceiling.
Once the tracing is complete, remove the template.