background image

BLACKBERRY RADAR R2 ITE100-1 INSTALLATION GUIDE 

DRY VAN, INSULATED TRAILERS (BARN DOORS)—CARGO PERCENTAGE  

15

 

 

 

IMPORTANT:

 Ensure the signal icon on each Radar R2 20° Tilt Bracket and Visor is placed in 

the same orientation as the signal icon on the Radar R2 module.  Ensure the arrow icon on the 

visor is placed in the same orientation as on the Radar R2 module.

 

 
 

 

 

 

The module is prepared for installation on the asset. 

 

 

Содержание Radar R2

Страница 1: ...BLACKBERRY RADAR R2 ITE100 1 October 2022 Installation Guide Dry Van Insulated Trailers Barn Doors Cargo Percentage...

Страница 2: ...module identifier to an asset identifier 8 3 4 Module installation 10 3 4 1 Prepare module for installation Battery connection 11 3 4 2 Installing module on an asset 16 3 4 3 Dry van installation proc...

Страница 3: ...see Section 3 Match the module identifier with the asset identifier on the installation worksheet Install the module onto the asset Task 3 Uninstall a module see Section 4 Remove the module from the a...

Страница 4: ...for installation you need to obtain a worksheet where you can record the pairing of each BlackBerry R2 module to its companion BlackBerry Radar H2 module and its asset that is the trailer container th...

Страница 5: ...le Drill Template Upper mount installs only Lithium Metal Battery Fastener Bag 4 screws device Radar R2 20 Side Mount Tilt Bracket Visor Accessory Kit Package Contents NOTE The Radar R2 20 Side Mount...

Страница 6: ...3 8 head 1 4 14 thread 1 length 1 1 4 length For installation in narrow clearance areas blunt ended screws like thread rolling screws are recommended Drill Bit A 7 32 6mm B 3 16 5mm Nut Driver Socket...

Страница 7: ...asses Tape Measure Wrench Required only if nuts and bolts are used Recommended tools to complete the installation T Square or Pocket Level Polyurethane Sealant Towel Hammer and Punch Ladders Tall ladd...

Страница 8: ...umber of the asset you wish to track The asset identifiers are entered into the application when you add the assets and will be listed on your installation worksheet The identifier for each Radar R2 m...

Страница 9: ...kBerry Radar R2 module to the asset remove the partially attached label from the front surface of the outer housing and place it on your worksheet on the row with asset the BlackBerry Radar R2 will tr...

Страница 10: ...a location where they are susceptible to damage from Normal usage activities such as loading or unloading cargo Moving parts of the asset Road debris This diagram illustrates the supported installati...

Страница 11: ...ry door to the outer housing and complete the module assembly process Tip If you find it difficult to remove the battery door from the outer housing you may insert a tool such as a screwdriver near th...

Страница 12: ...The LED will blink to indicate the module is active NOTE It can take up to 5 seconds for the blink sequence to begin Please be patient Once you see the LED blink you may continue to the next step 4 F...

Страница 13: ...dar R2 20 tilt brackets bracket fasteners visor and visor fastener 6 Remove the liner from the rear of the visor to expose the adhesive 7 Align the orientation of the arrow and signal icon on the viso...

Страница 14: ...le and visor and the bracket s guide tabs are seated within the rear openings of the module 9 Secure the brackets and visor to the module with the supplied fasteners IMPORTANT The longer visor screw F...

Страница 15: ...15 IMPORTANT Ensure the signal icon on each Radar R2 20 Tilt Bracket and Visor is placed in the same orientation as the signal icon on the Radar R2 module Ensure the arrow icon on the visor is placed...

Страница 16: ...ule and asset pairings by removing the partially attached label from the front of the module and placing it on the installation worksheet next to the asset that will be tracked by the module Tip For m...

Страница 17: ...Radar R2 module there are two installation positions to choose from depending on your needs Position 1 Upper mount installation Install horizontally on the upper edge of the door frame or the ceiling...

Страница 18: ...r and you wish to avoid drilling through the ceiling completely we recommend the following options 1 If the ceiling s surface is metal plastic fiberglass etc attach to the asset s ceiling using the ac...

Страница 19: ...installing the fasteners from the outside of the trailer This provides better sealing and protects the fastener s threads from continuous exposure to the weather If thread cutting screws are used the...

Страница 20: ...d cutting screws are used the door frame will hold the screws in place and prevent the screws from turning when the locknuts are applied Preventing the screw from turning will allow lock nuts to be in...

Страница 21: ...ble you must position the module as close to the rear of the trailer as the trailer s construction will allow IMPORTANT Ensure the signal icon on the module is pointed towards the cargo that will be m...

Страница 22: ...llation check the interior and exterior of the door frame to determine if you will drill completely through the door frame to the exterior of the trailer IMPORTANT If you must drill completely through...

Страница 23: ...steners in your installation IMPORTANT Drilling through the roof is not recommended If the use of fasteners is supported by the trailer construction you may proceed with the installation of the Radar...

Страница 24: ...Radar R2 on the ceiling of your trailer and the center of your trailer has exposed roof supports do not install the Radar R2 between the roof supports Installing the Radar R2 between roof supports wi...

Страница 25: ...guide record the module identifier and the asset identifier the module will be paired with For your convenience you may quickly create a record of the module and asset pairings by removing the partia...

Страница 26: ...t it stays on the door frame surface for accurate drilling of your holes It is recommended that you install the module as straight as possible on the asset To help ensure the module is straight you ma...

Страница 27: ...door frame installations Due to the thicker harder steel used on some door frames you may wish to follow these suggestions Tip 1 To shorten drilling time and prolong the life of your drill bit you may...

Страница 28: ...rations and ensure surface is clean and dry 6 Insert your fastener of choice into the holes and fasten the module to the ceiling using one of the approaches below Interior screw installation Boxed Doo...

Страница 29: ...om turning when the locknuts are applied Preventing the screw from turning will allow lock nuts to be installed removed from the inside of the trailer simplifying future maintenance Apply a bead of se...

Страница 30: ...pplied Preventing the screw from turning will allow lock nuts to be installed removed from the inside of the trailer simplifying future maintenance Place the fastener in the hole and begin to drive th...

Страница 31: ...BLACKBERRY RADAR R2 ITE100 1 INSTALLATION GUIDE DRY VAN INSULATED TRAILERS BARN DOORS CARGO PERCENTAGE 31 7 Installation is complete...

Страница 32: ...ion 3 3 of this guide record the module identifier and the asset identifier the module will be paired with For your convenience you may quickly create a record of the module and asset pairings by remo...

Страница 33: ...that it stays on the ceiling surface for accurate drilling of your holes It is recommended that you install the module as straight as possible on the asset To help ensure the module is straight you ma...

Страница 34: ...use fasteners to install the module you will drill through the ceiling Other trailers such as insulated trailers may have a thicker ceiling that will offer the opportunity to avoid drilling completely...

Страница 35: ...ve any dust or debris left over from the drilling or de burring operations and ensure surface is clean and dry 6 Insert your fastener of choice into the holes and fasten the module to the ceiling usin...

Страница 36: ...damaging the well nut Do not over tighten the fastener Do not tighten fastener beyond 35 in lb 4N m 7 Installation is complete Tips for well nut installation Tip 1 For fastest installation we recomme...

Страница 37: ...surface The following chart illustrates recommended surface preparation techniques for various installation surface materials Installation Surface Material Recommended Surface Preparation Procedure Ba...

Страница 38: ...e module s front housing and placing it on the installation worksheet next to the asset this module will track 3 Find and mark the centerline of the trailer s ceiling Tip When you are marking the cent...

Страница 39: ...niversal Primer ampule that was included in your adhesive kit Apply the primer to the back of the module where the tape will be applied IMPORTANT If the module will be installed on a plastic surface y...

Страница 40: ...e prepared mounting surface Apply firm pressure 15 psi to the module for 30 45 seconds to ensure the adhesive bonds to the mounting surface 9 Installation is complete IMPORTANT Minimum application tem...

Страница 41: ...ywood Recommended Cold Weather Installation Tools Cordless Heat Gun and Attachments Raise installation surface temperature for improved adhesion Non Contact Thermometer Check surface temperature for a...

Страница 42: ...aces To ensure you have fresh installation surface primer to use on your asset s installation surfaces conserve your primer by using one primer ampule to prime multiple devices To apply the primer A C...

Страница 43: ...rials Installation Surface Material Recommended Surface Preparation Procedure Bare metals Steel Aluminum Lightly sand with 180 240 grit sandpaper to remove any surface oxidation or surface contaminant...

Страница 44: ...the ceiling Trace the outline of the template on the ceiling Once the tracing is complete remove the template 7 Using the heat gun raise the temperature of the of the installation surface For best adh...

Страница 45: ...the ampule at the Crush at Dot icon to release the primer and saturate the felt applicator tip at the end of the tube B Once the primer has saturated the applicator rub the felt tip where the tape wi...

Страница 46: ...BLACKBERRY RADAR R2 ITE100 1 INSTALLATION GUIDE DRY VAN INSULATED TRAILERS BARN DOORS CARGO PERCENTAGE 46 10 Installation is complete...

Страница 47: ...ular arrow on the Radar R2 module is pointed towards the ceiling and the signal icon on the Radar R2 module is pointed towards the cargo that will be monitored NOTE The for proper operation the wall s...

Страница 48: ...ed label from the rear housing of the module and placing it on the installation worksheet next to the asset that will be tracked by this module 2 Mark the height where the device will be installed on...

Страница 49: ...odule as level as possible on the asset To help ensure the module is straight you may try one of the following techniques Technique 1 Using a square or level confirm the door frame is perfectly vertic...

Страница 50: ...ruction and selected fasteners IMPORTANT To avoid drilling completely through the wall of the asset we recommend limiting the depth of the drilling Tip 1 Wood Screws Thick Wall Section Plywood or Comp...

Страница 51: ...ule to the wall using one of the approaches below Wood Screws Having drilled a pilot hole slightly smaller than your fastener use a screwdriver or drill and driver bit and nut driver to drive the scre...

Страница 52: ...ing path will affect the cargo reporting 8 Installation is complete Tips for well nut installation Tip 1 For fastest installation we recommend using a drill and nut driver to install the bolt into the...

Страница 53: ...BLACKBERRY RADAR R2 ITE100 1 INSTALLATION GUIDE DRY VAN INSULATED TRAILERS BARN DOORS CARGO PERCENTAGE 53...

Страница 54: ...ods must be adequately trained and hold a training certificate or perform those activities in the presence and under the direct supervision of a person who is adequately trained and who holds a traini...

Страница 55: ...ERS BARN DOORS CARGO PERCENTAGE 55 4 2 Module removal Module removal approach will be determined by the installation method used Fastener Mounting Removal 1 If you have used fasteners in your installa...

Страница 56: ...ALLATION GUIDE DRY VAN INSULATED TRAILERS BARN DOORS CARGO PERCENTAGE 56 Adhesive Mounting Removal 1 Insert a tool between the bottom edge of the module and the mounting surface Pry gently to separate...

Страница 57: ...rom the back of the product and separate the inner housing from the outer housing to access the battery Retain the screws as all screws will be required to re secure the inner housing to the outer hou...

Страница 58: ...ill blink to indicate the module is active NOTE It can take up to 5 seconds for the blink sequence to begin Please be patient Once you see the LED blink continue to the next step 3 Fully install the b...

Страница 59: ...secure the battery door to the rear housing 2 Ensure the battery cable is disconnected from the battery connector Lift the battery and tuck the connector under the battery Return the battery to the ba...

Страница 60: ...the door There are various techniques that can be used to repair the holes This section will discuss some approaches you may wish to use Method 1 Hole Plugs 1 With the module removed measure the size...

Страница 61: ...PERCENTAGE 61 Method 2 Sealant 1 With the module removed you ll have two holes 2 Fill the holes with a weatherproof sealant If desired you may use 100 Silicone Exterior Grade caulk or Polyurethane Se...

Страница 62: ...CKBERRY RADAR R2 ITE100 1 INSTALLATION GUIDE DRY VAN INSULATED TRAILERS BARN DOORS CARGO PERCENTAGE 62 Method 3 Fasteners 1 With the module removed you ll have two holes 2 Drive the screws into the ho...

Страница 63: ...2 ITE100 1 INSTALLATION GUIDE DRY VAN INSULATED TRAILERS BARN DOORS CARGO PERCENTAGE 63 5 Support If you run into any problem during the installation process contact the BlackBerry Radar support team...

Страница 64: ...n or warranty of any kind by BlackBerry Limited and its affiliated companies BlackBerry BlackBerry assumes no responsibility for any typographical technical or other inaccuracies errors or omissions i...

Отзывы: