
BLACKBERRY RADAR R2 ITE100-1 INSTALLATION GUIDE
DRY VAN, INSULATED TRAILERS (BARN DOORS)—CARGO PERCENTAGE
50
4.
Using a drill bit, drill a shallow hole through each of the marked holes. This will create two
holes you will use to mount the Radar R2 bracket and device to the asset.
Drilling tips for side wall installations
Here are some tips to help you determine the best drilling strategy for your trailer
construction and selected fasteners.
IMPORTANT:
To avoid drilling completely through the wall of the asset, we
recommend limiting the depth of the drilling.
Tip 1. Wood Screws, Thick Wall Section (Plywood or Composite side walls):
Drill
a pilot hole slightly smaller diameter than your fastener. Limit the depth of the
drilling, to avoid breaking through the wall.
Tip 2. Well Nuts, Thick Wall Section (Insulated Trailers):
Drill a hole large enough in diameter to accommodate your well nut. Limit the
depth of the drilling, to avoid breaking through the wall.
Drilling
Limit
Holes
Wood
Screws
Well
Nuts
Holes
Wood Screws
Well Nuts