BLACKBERRY RADAR R2 ITE100-1 INSTALLATION GUIDE
DRY VAN, INSULATED TRAILERS (BARN DOORS)—CARGO PERCENTAGE
3
1 Overview
This guide provides detailed instructions for installing and activating new BlackBerry Radar R2
modules. It includes three main tasks:
Task 1: Get ready for installation (see Section 2)
Task 2: Install a BlackBerry Radar R2 module (see Section 3)
•
Match the module identifier with the asset identifier on the installation worksheet.
•
Install the module onto the asset.
Task 3: Uninstall a module (see Section 4)
•
Remove the module from the asset.
•
Remove/replace the battery and prepare the device for shipping.
•
Post-removal surface repair.
Complete BlackBerry Radar documentation is available online when you log in to BlackBerry
Radar Dashboard. For instructions on how to configure the BlackBerry Radar Dashboard or how
to activate newly installed devices, see the online documentation.