BLACKBERRY RADAR R2 ITE100-1 INSTALLATION GUIDE
DRY VAN, INSULATED TRAILERS (BARN DOORS)—CARGO PERCENTAGE
48
Wall Placement—Fastener Mounting
Follow these instructions if you are installing the
module on a trailer with barn (swing) doors.
NOTE:
In this example the wall of the trailer is plywood.
1.
As indicated in Section 3.3 of this guide, record
the module identifier and the asset identifier the
module will be paired with. For your convenience, you may quickly create a record of the
module and asset pairings by removing the partially attached label from the rear housing
of the module and placing it on the installation worksheet, next to the asset that will be
tracked by this module.
2.
Mark the height where the device will be installed on the side wall of the trailer.
IMPORTANT:
The module must be installed on the
left
wall of the container, just ahead
of the door frame.
•
The bottom of the R2 device and bracket assembly should be 90” (229 cm) above the
interior floor.
•
The R2 device and bracket assembly should be tilted forward 10°. This 10° tilt angle is
automatically included in the installation template.
Tip:
When you are marking the line on the wall, we recommend continuing the mark
along the wall for approximately 4” (10 cm) to accommodate the width of the installation
template.