BLACKBERRY RADAR R2 ITE100-1 INSTALLATION GUIDE
DRY VAN, INSULATED TRAILERS (BARN DOORS)—CARGO PERCENTAGE
32
Scenario 2:
Ceiling Placement—Fastener Mounting
Follow these instructions if you plan to install to the ceiling.
NOTE:
In this example, the ceiling is 5/8” (16mm) plywood
and the door frame is too narrow to support installation.
1.
As indicated in Section 3.3 of this guide, record the
module identifier and the asset identifier the module will be paired with. For your
convenience, you may quickly create a record of the module and asset pairings by
removing the partially attached label from the rear housing of the module and placing it
on the installation worksheet, next to the asset that will be tracked by this module.
2.
Find and mark the centerline of the ceiling.
Tip:
When you are marking the centerline on the container, we recommend continuing
the mark along the ceiling for approximately 4” (10 cm).