BLACKBERRY RADAR R2 ITE100-1 INSTALLATION GUIDE
DRY VAN, INSULATED TRAILERS (BARN DOORS)—CARGO PERCENTAGE
36
Well Nuts
•
Insert the Well Nuts into the holes. Align the holes on the module to the well nuts, then
insert the fasteners. Secure the module to the asset.
•
Do not tighten fastener beyond 35 in-lb. (4 N-m) to avoid damaging the well nut.
Do not over-tighten the fastener. Do not tighten fastener beyond 35 in-lb. (4N-m).
7.
Installation is complete.
Tips for well nut installation
Tip 1:
For fastest installation, we recommend using a drill and nut driver to
install the bolt into the well nut. To avoid over tightening, use the lowest speed
to install the bolt.
Tip 2:
To avoid spinning the well nut during the install, we recommend pressing
the module against the wall while installing each fastener.
Well
Nut
35 in-lb.
4 N-m
Torque
Limit