LB 983 NightOWL II Operating Manual
Quick Start
67
When selecting
<Schedule Controller Template>
a dialog box pops up to select the desired
control sequence.
Chose
to confirm the selected template and continue.
On the next page the
<Start Execution>
time can be selected. In the sample above, the first
measurement will be executed on Wednesday the 22th of September at 15:15:00.
The
<Overall Measurements>
are set to 2 and the
<Delay/Cycle Time>
was set to 2, as well.
Therefore the system will add two measurements into the scheduler. The first will be executed
Wednesday the 22th of September at 15:15:00 and the second will be executed Wednesday the
22th of September at 17:15:00.
The measurements will be executed in the background by the scheduler and will be sorted au-
tomatically into the indiGO structured tree.
The contents of the scheduler can be verified or deleted via the
<View>
<Scheduler>
com-
mand from the main menu of indiGO.
Содержание NightOWL II LB 983
Страница 4: ...LB 983 NightOWL II Operating Manual Contents 10 7 Index 132...
Страница 6: ......
Страница 16: ......
Страница 67: ...LB 983 NightOWL II Operating Manual Quick Start 63...
Страница 86: ......
Страница 120: ......
Страница 132: ...LB 983 NightOWL II Operating Manual Appendix 128 Noise Killer hood Foam block...