Page 3
Table of Contents
Cover
..........................................................1
General Safety Information............................................2
Table of Contents ..........................................................3
Overview
..........................................................4
Purpose of equipment ............................................4
Limits of intended use ............................................4
Specifi cations
.......................................................5-7
System
Specifi cations ............................................5
Compatible
Fluids...................................................5
Component
Descriptions
.....................................6-7
Confi guration Planning
..........................................8-11
Planning Worksheet & Instructions .....................8-9
Planning Worksheet: Worked Examples .........10-11
Installation
...................................................12-23
Required tools
....................................................12
Installation 41-Step Procedure
.....................12-15
Mechanical Detail Illustrations .........................16-17
Pump/meter
Installation
(fi g 20) ....................16
Smart
Controller
TM
Installation (fi g 21) ..........16
Hose Reel/Ready Light mount (fi g 22) ..........17
Fluid Valve Installation (fi g 23) ......................17
Wiring
Illustrations
...........................................18-23
Complete
System
(fi g 24)..............................18
Console
(fi g 25) .............................................19
Smart
Controller
TM
(fi g 26) .............................20
Wire End Detail (fi g 27) .................................21
Valves and Ready Lights (fi g 28,29) .............21
Ground Level Set-up (fi g 30) .........................22
Impulse
Meter
(fi g 31) ...................................23
Basic Operating Procedures (BP)
.......................24-35
Overview of PIN codes .........................................24
Guide to Basic Procedures...................................25
Special Methods and Suggestions .......................26
BP1:
Normal Power Up ........................................27
BP2:
New Dispense Job ......................................28
BP3:
Job Status Review ......................................29
BP4:
Queue Jumping ...........................................30
BP5:
Job Deletion ................................................31
BP6:
Tank Refi lling ...............................................32
BP7:
Inventory Status ..........................................33
BP8:
Dispense Log ..............................................34
BP9:
PIN entry/revision ........................................35
Special Console Procedures (SP)
.......................36-46
SP1:
Console Initialization ...................................36
SP2:
Fluid Identifi cation ..................................37-38
SP3:
SC Identifi cation .....................................39-40
SP4:
Comm Port Selection ..................................41
SP5:
Set Time/Date..............................................42
SP6:
System Confi guration [save/read] ..............43
SP7:
System Log .................................................44
SP8:
Test All SC’s ................................................45
SP9:
SC Comm Test ............................................46
Problem Diagnostics and Correction
.................47-56
Guide to Diagnostics
.........................................47
Error Diagnosis / Action Tables
...................48-56
Repair Procedures (RP)
.......................................57-65
RP1:
Replacing Console ......................................57
RP2:
Replacing Impulse Meter ............................57
RP3:
Replacing Air or Fluid Valve ........................58
RP4:
Replace Ready Light ...................................58
RP5:
Replace Smart Controller ............................59
RP6:
Replace Ticket Printer .................................59
RP7:
Add One or More Stations ...........................59
RP8:
Add Another Fluid to System .......................60
RP9:
Verifi cation of Comm/Power Wiring.............61
RP10:
Verifi cation of Valve Port Wiring ................61
RP11:
Verifi cation of Inactive Port Setup .............62
RP12:
Troubleshooting SC Problems ..................62
RP13:
Ground Level SC Identifi cation .................63
RP14:
Setting up for Future Expansion................63
RP15:
System Restore from Error .......................64
RP16:
Troubleshooting SC Magnetic Polling .......64
RP17:
Troubleshooting Oil Quantity Errors ..........65
RP18:
Assuring a Suitable Power Supply ............65
Cable Substitutions......................................................66
PIN Code Record Form ...............................................67
Warranty
........................................................68