Using the 2300-584-R Software with the ME7828A
6-7 High-Band Calibration
3656B W1 Cal/Ver Kit & 2300-584-R PVS UG
PN: 10410-00286 Rev. L
6-19
6.
The VNA measures the short/open device data, then the
VNA Calibration: Step 5 of 5
dialog box appears.
a.
Remove the Short and the Open from Port 1 and Port 2, respectively.
b.
Slide the two T-R modules towards each other and connect the VNA Port 1 (Female) to VNA Port 2
(Male) directly.
c.
When ready to proceed, click
OK
.
7.
The program execution skips to
Section 6-8 “Application Interface – Main Menu Tab” on page 6-22
.
6-7
High-Band Calibration
During this procedure, the high-band portion of the VNA is calibrated with a full 12-term SSST
(Short-Short-Short-Thru) calibration. In
Section 6-6 “Low-Band Calibration” on page 6-17
, the low-band
portion of the VNA is calibrated with a full 12-term SOLT (Short-Open-Load-Thru) calibration.
Procedure
1.
The
W1 Verification Install Adapter
dialog box appears.
a.
Install a F-F adapter on VNA Port 1 so that a Female connector is available to the operator.
b.
Install a F-M adapter on VNA Port 2 so that a Male connector is available to the operator.
c.
When ready to proceed, click
OK
.
Figure 6-28.
VNA Calibration: Step 5 of 5 Dialog
Figure 6-29.
Anritsu W1 Verification Dialog