
Using the 2300-584-R Software with the ME7838E4
5-15 Low-Band Calibration Port 3 – Port 4
3656B W1 Cal/Ver Kit & 2300-584-R PVS UG
PN: 10410-00286 Rev. L
5-43
5.
The VNA measures the open/short device data, then the
VNA Calibration: Step 4 of 5
dialog box appears.
a.
Connect the Male Short #1 (2.02 mm) to VNA Port 3.
b.
Connect the Female Open to VNA Port 4.
c.
When ready to proceed, click
OK
.
6.
The VNA measures the short/open device data, then the
VNA Calibration: Step 5 of 5
dialog box appears.
a.
Remove the Short and the Open from Port 3 and Port 4, respectively.
b.
Slide the two T-R modules towards each other and connect the VNA Port 3 (Female) to VNA Port 4
(Male) directly.
c.
When ready to proceed, click
OK
.
7.
The program execution skips to
Section 5-17 “Application Interface – Main Menu Tab” on page 5-47
Figure 5-61.
VNA Calibration: Step 4 of 5 Dialog
Figure 5-62.
VNA Calibration: Step 5 of 5 Dialog
Содержание 3656B W1
Страница 2: ......
Страница 12: ...Contents 10 PN 10410 00286 Rev L 3656B W1 Cal Ver Kit 2300 584 R PVS UG...
Страница 277: ......