Installation
34
CV17 17" Modero Coor Video Touch Panels
5.
Disconnect the terminal end of the power cable from the connected PSN power supply.
6.
Carefully slide the main NXD unit (
B
in FIG. 36) into the conduit box, so the Mounting Tab lies flush
against the conduit box (
C
in FIG. 36).
7.
Insert and secure four securing #8 flat-head Mounting Screws into their corresponding holes located
along the sides of the NXD (FIG. 36).
These #8 screws are not included within the CB Installation Kit
and must be provided by the installer.
8.
Replace the magnetic faceplate (
A
in
FIG. 36) back onto the main NXD unit (
B
in
FIG. 36). Make sure to
align the Microphone, Light, and PIR Motion sensor locations to their respective openings on the front
bezel/faceplate.
9.
Connect the terminal RJ-45, Ethernet, and any optional audio/video wiring to their respective locations
(
outside the conduit box
) on either the NXA-AVB, Ethernet port, or NetLinx Master.
10.
Reconnect the terminal power connector on the PSN and apply power.
Installing the NXD-CV17 into drywall using Expansion Clips
Expansion clips are mounted through the four oval holes located along the rim of the NXD-CV17. As the
screw is tightened, the clip bends toward the insertion hole and into the wall. This bending creates a "grip" on
the wall by either pressing onto the wall or by securing the drywall between the housing and the drywall clip.
The most important thing to remember when mounting the NXD-CV17 Wall Mount is that the outer frame
(Mounting Ridge) must be mounted flush against the mounting surface.
Most beams have a distance of about 14" to 16". This is too narrow to accommodate the 17.03" (43.26 cm)
wide outer housing (back box) of the NXD-CV17.
1.
Determine which stud beam configuration to use:
Pre-wall
framing is done prior to the drywall installation (local framing instructions vary based on
location and building codes). FIG. 37 shows show to mount and position the main NXD unit into a
pre-wall environment (for use with drywall clips).
There is no notching of a beam in this method.
The center vertical beam is cut out, attached, and
secured to two horizontal beams, then further secured into place by an another offset vertical beam
that "frames" the insertion area. This framing method provides a space of ~1.20 inches (30.63 mm)
above and below the NXD unit to provide the drywall clips with room to secure themselves against
the drywall.
Содержание modero NXD-CV17
Страница 1: ...Operation Reference Guide Touch Panels NXT D CV17 17 Modero Touch Panel Last Revised 8 04 2010...
Страница 10: ...viii CV17 17 Modero Coor Video Touch Panels Table of Contents...
Страница 56: ...Installation 46 CV17 17 Modero Coor Video Touch Panels...
Страница 86: ...Upgrading Modero Firmware 76 CV17 17 Modero Coor Video Touch Panels...
Страница 162: ...Appendix 152 CV17 17 Modero Coor Video Touch Panels...
Страница 167: ...Troubleshooting 157 CV17 17 Modero Coor Video Touch Panels...