
Installation
31
CV17 17" Modero Coor Video Touch Panels
Refer to your particular VESA mount manufacturer’s installation procedures for further surface mounting
procedures.
Pre-wall Installation of the CB-TP17 Conduit Box
Wall Mount panels (NXDs) are contained within a metallic outer housing (back box). This back box is
not
removed
when installing the NXD into a Conduit Box (CB-TP17). The back box is
only
removed to gain
access for the replacement of the Compact Flash component or upgrade to the VESA housing. Refer to the
Step 1: Removing the existing NXD Outer Housing
section on page 18 for more detailed information.
The CB-TP17 Conduit/wallbox is an optional metallic box that is secured into a beam in a
pre-wall
setting (
where no walls or present
). Installation procedures and configurations can vary. This section
describes the installation procedures for the most common installation scenario.
The most important thing to remember when mounting this conduit box is that the mounting tabs must be
mounted flush against the outside of the sheetrock. This step determines whether or not the mounting stud is
notched (
cutout-out to fit the conduit box
).
1.
Measure the distance between the inside of the two selected stud beams. Most beams have a distance of
about 14" to 16". This is too narrow to accommodate the 17.072" (43.36 cm) wide CB-TP17 conduit box.
2.
Determine whether one or both of the selected stud beams must be notched (FIG. 34). The determining
factor is the flush alignment of the mounting tabs along the outside of the
post-wall
sheetrock.
3.
Cutout the notched beam using a height of 13.554" (34.43 cm) (as shown below in FIG. 34) and a depth
equal to the thickness of the drywall
.
INSTALLER: LEAVE A GAP BETWEEN THE STUD AND CONDUIT BOX TO
ACCOMMODATE THE DRYWALL/SHEETROCK.
This gap allows the installation of
the drywall/sheetrock after the CB-TP17 has been mounted onto the beams.
The stud notching and conduit box installation must be done prior to any wall
installation.
FIG. 34
CB-TP17 conduit box installation into a notched stud (showing before and after installation)
Mounting
tabs flush on
17.07"
~14" to 16"
the
OUTSIDE
of sheetrock
13.554"
(34.43 cm)
(43.36 cm)
Before
After
Use a block to secure the
Conduit Box to the
notched stud
Horizontal
support beam
Содержание modero NXD-CV17
Страница 1: ...Operation Reference Guide Touch Panels NXT D CV17 17 Modero Touch Panel Last Revised 8 04 2010...
Страница 10: ...viii CV17 17 Modero Coor Video Touch Panels Table of Contents...
Страница 56: ...Installation 46 CV17 17 Modero Coor Video Touch Panels...
Страница 86: ...Upgrading Modero Firmware 76 CV17 17 Modero Coor Video Touch Panels...
Страница 162: ...Appendix 152 CV17 17 Modero Coor Video Touch Panels...
Страница 167: ...Troubleshooting 157 CV17 17 Modero Coor Video Touch Panels...