Maintenance and Troubleshooting
|
6-11
Calibration
Calibration gas check
Check that the correct calibration gas values have been entered into the control
unit. To do this, select the Cal Gas Value menu option from the Calibrate key
on the control unit and check that the calibration gas values entered match the
analyzed concentration of the cylinders.
Check that the calibration gas cylinders are turned on and are not empty.
Check for the proper flow rate and proper delivery pressure of calibration gases
when the remote calibration unit has been activated (see the Inject Cal Gas menu
option from the Calibrate key section for help on how to do this).
Calibration line check
Ensure that your calibration line is not contaminated with such things as pipe dope,
cutting fluid, oil, or solvents. All these contaminants produce hydrocarbon vapors
that interfere with the proper calibration of your analyzer. The result of this will
be lower than expected oxygen readings. To test for contaminated lines, you must
temporarily bypass your current calibration line with a clean calibration line (directly
from cylinder to the sensor calibration inlet port, using a flow meter to set the proper
flow) and compare the response with that from the possibly contaminated line. The
best calibration gas to use for this check is an O
2
zero calibration gas.
Содержание CEM/Humox
Страница 20: ...2 4 Thermox CEM Humox Analyzer This page intentionally left blank ...
Страница 38: ...3 18 Thermox CEM Humox Analyzer Figure 3 16 Series 2000 alarm connections example ...
Страница 40: ...3 20 Thermox CEM Humox Analyzer Figure 3 17 Series 2000 2 wire RS 485 communication connection ...
Страница 42: ...3 22 Thermox CEM Humox Analyzer Figure 3 18 Series 2000 4 wire RS 485 communication connections ...
Страница 44: ...3 24 Thermox CEM Humox Analyzer ...
Страница 76: ...4 32 Thermox CEM Humox Analyzer This page intentionally left blank ...
Страница 105: ...Service and Parts 7 3 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 107: ...Service and Parts 7 5 Figure 7 1 Cell replacement ...
Страница 130: ...B 4 Thermox CEM Humox Analyzer This page intentionally left blank ...
Страница 134: ...C 4 Thermox CEM Humox Analyzer Figure C 1 Modulation of external power supply OPTIONAL ...
Страница 136: ...D 2 Thermox CEM Humox Analyzer This page intentionally left blank ...