3-6 | Thermox CEM/Humox Analyzer
Weatherproof Wall/Z-Purge Option
Don’t open the Z-purge enclosure until you verify that the area has been
classified as nonhazardous.
Figure 3-5 shows the wall and pole mounting dimensions for the Series 2000
weatherproof Z-purge enclosure. To mount this control unit version, you must
also connect instrument air to the Purge Inlet and set the pressure and flow as
indicated on the warning tag on the control unit.
Z-Purge Shutdown Procedure
: Hot internal parts are above the ignition tempera
-
ture of combustible gases. Remove power from both the sensor and control unit
for 1 hour while maintaining purge air flow before door is opened, unless the area
is demonstrated to be nonhazardous.
Z-Purge Start-up Procedure:
Power shall not be restored after the enclosure has
been opened until the enclosure has been purged for 1 hour at a pressure of 0.4”
of water.
Figure 3-5.
Series 2000, weatherproof
wall/Z-purge.
Содержание CEM/Humox
Страница 20: ...2 4 Thermox CEM Humox Analyzer This page intentionally left blank ...
Страница 38: ...3 18 Thermox CEM Humox Analyzer Figure 3 16 Series 2000 alarm connections example ...
Страница 40: ...3 20 Thermox CEM Humox Analyzer Figure 3 17 Series 2000 2 wire RS 485 communication connection ...
Страница 42: ...3 22 Thermox CEM Humox Analyzer Figure 3 18 Series 2000 4 wire RS 485 communication connections ...
Страница 44: ...3 24 Thermox CEM Humox Analyzer ...
Страница 76: ...4 32 Thermox CEM Humox Analyzer This page intentionally left blank ...
Страница 105: ...Service and Parts 7 3 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 107: ...Service and Parts 7 5 Figure 7 1 Cell replacement ...
Страница 130: ...B 4 Thermox CEM Humox Analyzer This page intentionally left blank ...
Страница 134: ...C 4 Thermox CEM Humox Analyzer Figure C 1 Modulation of external power supply OPTIONAL ...
Страница 136: ...D 2 Thermox CEM Humox Analyzer This page intentionally left blank ...