Cleaning, maintenance and repairs
192
UX01 Super CP Plus BAG0229.2 11.21
16. Drain the pressure filling.
17. Remove the suction hose or cap from the
suction connection.
Exit the spraying range of the
implement!
The nozzles are automatically flushed
after 10 seconds.
18. Before the automatic draining of the tank
emptying, place a suitable container
underneath.
19. HighFlow: Set the secondary agitator back
to the previous position.
20. Switch off the pump.
21. Drain the pressure sensors by loosening
the hose from the pressure sensor.
Super-L boom pressure sensor on the boom
valve chest
Agitator pressure sensor on the control panel
(22)
(23)
Содержание UX 4201 Super
Страница 21: ...General safety instructions UX01 Super CP Plus BAG0229 2 11 21 21...
Страница 236: ...Diagrams and overviews 236 UX01 Super CP Plus BAG0229 2 11 21 15 1 Liquid circuit Part width section control...
Страница 238: ...Diagrams and overviews 238 UX01 Super CP Plus BAG0229 2 11 21 15 3 Liquid circuit Part width section control AmaSwitch...
Страница 239: ...Diagrams and overviews UX01 Super CP Plus BAG0229 2 11 21 239 15 4 Actuators and sensors...
Страница 240: ...Diagrams and overviews 240 UX01 Super CP Plus BAG0229 2 11 21 15 5 Hydraulic diagram Basic implement...
Страница 241: ...Diagrams and overviews UX01 Super CP Plus BAG0229 2 11 21 241 Profi folding ContourControl and SwingStop...
Страница 247: ...UX01 Super CP Plus BAG0229 2 11 21 247...
Страница 256: ......