
Layout and function of the sprayer boom
UX01 Super CP Plus BAG0229.2 11.21
113
6.10.2 7-hole nozzles / FD nozzles (optional)
The same conditions apply for using 7-hole nozzles / FD nozzles as
for the 3-ray nozzles. In contrast to the three-ray nozzle, in the case
of the 7 hole nozzle / FD nozzles, the outlets are not oriented
downwards, but instead point to the side. This allows very large drops
to be produced on the plants using only slight impact forces.
The following 7-hole nozzles are available:
•
SJ7-02-CE 74 – 120l UAN (at 8 km/h)
•
SJ7-03-CE 110 – 180l AUS
•
SJ7-04-CE 148 – 240l AUS
•
SJ7-05-CE 184 – 300l AUS
•
SJ7-06-CE 222 – 411l AUS
•
SJ7-08-CE 295 – 480l AUS
The following FD nozzles are available:
•
FD 04 150 - 240 l UAN/ha (at 8 km/h)
•
FD 05 190 - 300 l AUS/ha
•
FD 06 230 - 360 l AUS/ha
•
FD 08 300 - 480 l AUS/ha
•
FD 10 370 - 600 l UAN/ha*
Содержание UX 4201 Super
Страница 21: ...General safety instructions UX01 Super CP Plus BAG0229 2 11 21 21...
Страница 236: ...Diagrams and overviews 236 UX01 Super CP Plus BAG0229 2 11 21 15 1 Liquid circuit Part width section control...
Страница 238: ...Diagrams and overviews 238 UX01 Super CP Plus BAG0229 2 11 21 15 3 Liquid circuit Part width section control AmaSwitch...
Страница 239: ...Diagrams and overviews UX01 Super CP Plus BAG0229 2 11 21 239 15 4 Actuators and sensors...
Страница 240: ...Diagrams and overviews 240 UX01 Super CP Plus BAG0229 2 11 21 15 5 Hydraulic diagram Basic implement...
Страница 241: ...Diagrams and overviews UX01 Super CP Plus BAG0229 2 11 21 241 Profi folding ContourControl and SwingStop...
Страница 247: ...UX01 Super CP Plus BAG0229 2 11 21 247...
Страница 256: ......