Cleaning, maintenance and repairs
218
UX01 Super CP Plus BAG0229.2 11.21
14.12 Settings on the unfolded sprayer boom
Alignment parallel to the ground
When the sprayer boom is unfolded and correctly
adjusted, all of the spraying nozzles must have
the same parallel distance from the ground.
If this is not the case, align the unfolded sprayer
boom using counterweights (1) with the vibration
compensation
unlocked
. Attach the
counterweights accordingly on the boom.
Horizontal alignment
In the direction of travel, all of the boom sections
of the sprayer boom must be aligned. Horizontal
alignment can be necessary
•
after long periods of operation
•
or rough ground contact of the sprayer
boom.
inner boom
1. Loosen the lock nut of the adjusting
screw (5).
2. Turn the adjusting screw against the stops
until the inner boom section is aligned with
the centre part of the boom.
3. Tighten the lock nut.
Outer boom section
1. Loosen the bolts (2) for the fastening lug
(3). Alignment is carried out right on the
plastic jaw
(4) using the elongated slots of the
fastening lug.
2. Align the boom section.
3. Tighten the bolts (2).
Содержание UX 4201 Super
Страница 21: ...General safety instructions UX01 Super CP Plus BAG0229 2 11 21 21...
Страница 236: ...Diagrams and overviews 236 UX01 Super CP Plus BAG0229 2 11 21 15 1 Liquid circuit Part width section control...
Страница 238: ...Diagrams and overviews 238 UX01 Super CP Plus BAG0229 2 11 21 15 3 Liquid circuit Part width section control AmaSwitch...
Страница 239: ...Diagrams and overviews UX01 Super CP Plus BAG0229 2 11 21 239 15 4 Actuators and sensors...
Страница 240: ...Diagrams and overviews 240 UX01 Super CP Plus BAG0229 2 11 21 15 5 Hydraulic diagram Basic implement...
Страница 241: ...Diagrams and overviews UX01 Super CP Plus BAG0229 2 11 21 241 Profi folding ContourControl and SwingStop...
Страница 247: ...UX01 Super CP Plus BAG0229 2 11 21 247...
Страница 256: ......