![Amazone Precea 4500-2 Скачать руководство пользователя страница 166](http://html1.mh-extra.com/html/amazone/precea-4500-2/precea-4500-2_original-operating-manual_2919774166.webp)
2.
To restore the fertiliser flow on implements with
distributor heads and single row control:
Remove the bolt
1
.
1
CMS-I-00007406
3.
Actuate the coupling rod
2
.
Ro
w
1
2
3
4
5
6
7
8
9
10 11 12
Connection
A
B
C
D
E
F
G
H
I
J
G
L
4.
Connect the connection cable for the setting
motors
1
to the wiring harness according to the
table.
5.
Seal the free connection cable with a dust cap
after the row conversion.
2
1
CMS-I-00007405
6.
Install the conveyor hose
1
on the fertiliser
coulter
3
.
7.
Install the clamp
2
.
CMS-I-00003920
6 | Preparing the machine
Preparing the implement for operation
MG6149-EN-GB | J.1 | 18.10.2022 | © AMAZONE
160