GreenDrill control terminal 5.2
60
GreenDrill BAH0108-0 03.20
6.6.2
Calibration [grains/m
2
]
1. Make all of the entries shown in section 6.6, page 57.
2. Select the display with the
buttons.
3. Confirm the selection with the
button.
4. Enter the desired spread rate (e.g. 100 grains/m
2
)
with the
buttons.
5. Confirm the entry with the
button.
6. Select the display with the
buttons.
7. Confirm the selection with the
button.
8. Enter the 1000-grain weight with the
buttons
(e.g. 30 g).
9. Confirm the entry with the
button.
10. Select the display with the
buttons.
11. Confirm the selection with the
button.
12. Enter the germination capacity of the seed
with the
buttons (e.g. 95 %).
13. Confirm the entry with the
button.
Содержание GreenDrill GD200-E
Страница 2: ......
Страница 32: ...Structure and function 32 GreenDrill BAH0108 0 03 20 4 1 1 6 Seed metering wheel table ...
Страница 105: ......