![Amazone GreenDrill GD200-E Скачать руководство пользователя страница 58](http://html.mh-extra.com/html/amazone/greendrill-gd200-e/greendrill-gd200-e_operating-manual_2919758058.webp)
GreenDrill control terminal 5.2
58
GreenDrill BAH0108-0 03.20
6.6.1
Calibration [kg/ha]
1. Make all of the entries shown in section 6.6, page 57.
2. Select the display with the
buttons.
3. Confirm the selection with the
button.
4. Enter the desired spread rate
with the
buttons (e.g. 103.5 kg/ha).
5. Confirm the entry with the
button.
6. Select the display with the
buttons.
7. Confirm the selection with the
button.
8. Using the
buttons, set the time 1
)
2
)
during which the
seeding shaft will rotate during calibration (e.g. 0.5 min).
9. Confirm the entry with the
button.
1)
Calibrate for 0.5 minutes
for seeds such as wheat, barley, peas and high spread rates
Calibrate for 1.0 minute
for all seed types (standard)
Calibrate for 2.0 minutes
for fine seeds, e.g. rapeseed and phacelia.
2)
The "Calibration duration" menu item does not appear when
the GreenDrill has a calibration button (see section 6.6.3, page 62) and
the menu item "Calibration button available" (see section 7.1.9, page 91) is answered with
"YES".
Содержание GreenDrill GD200-E
Страница 2: ......
Страница 32: ...Structure and function 32 GreenDrill BAH0108 0 03 20 4 1 1 6 Seed metering wheel table ...
Страница 105: ......