GreenDrill control terminal 5.2
GreenDrill BAH0108-0 03.20
67
6.8
Hectare counter
Area calculation
is carried out using the "actual" forward speed values.
The control terminal must be connected
to the 7-pin tractor signal socket (see section 6.18.4.1, page 82) or
to the radar device (see section 6.18.4.3, page 84) or
to the GPS device (see section 6.18.4.4, page 85).
begins as soon as the seeding shaft starts rotating and the tractor starts moving.
6.8.1
Display of the areas / deleting part areas
1. Select the display with the
buttons.
2. Confirm the selection with the
button.
The following are displayed
the total area [ha]
the part area [ha]
3. Press the
button for 5 seconds to set the part area to zero.
The total area cannot be reset.
Содержание GreenDrill GD200-E
Страница 2: ......
Страница 32: ...Structure and function 32 GreenDrill BAH0108 0 03 20 4 1 1 6 Seed metering wheel table ...
Страница 105: ......