GreenDrill control terminal 5.2
80
GreenDrill BAH0108-0 03.20
6.18
Installations and connections – Control terminal 5.2
6.18.1
Installation of the control terminal 5.2
Fasten the bracket (1) in the tractor cab with 2
bolts.
Bend the bracket so as to provide optimum
reading of the display.
Insert the control terminal on the bracket in the
tractor cab.
6.18.2
Implement cable connection
The implement cable connects the control
terminal with the GreenDrill.
Connect the implement cable to the 6-pin signal
socket (1) of the control terminal.
Store the spare cable in the cab.
Do not coil up the cable.
Содержание GreenDrill GD200-E
Страница 2: ......
Страница 32: ...Structure and function 32 GreenDrill BAH0108 0 03 20 4 1 1 6 Seed metering wheel table ...
Страница 105: ......