![Amazone Cataya 3000 Special Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/amazone/cataya-3000-special/cataya-3000-special_operating-manual_2919710008.webp)
8
Cataya Special BAH0109-1 02.21
8.14
Moving the exact following harrow road safety bar into road transport/parking
position ................................................................................................................................ 169
8.14.1
Moving the road safety bar into road transport position ...................................................... 169
8.14.2
Moving the road safety bar into parking position ................................................................ 169
8.15
Soil tillage without seeding .................................................................................................. 170
8.15.1
Lifting the coulters and exact following harrow ................................................................... 170
8.15.2
Moving the coulters and exact following harrow into working position ............................... 171
9
Transportation ......................................................................................... 172
9.1
Moving the seeding combination into transport position ..................................................... 172
9.2
Legal regulations and safety ............................................................................................... 173
10
Use of the implement .............................................................................. 177
10.1
Initial operation .................................................................................................................... 178
10.2
Work floodlights ................................................................................................................... 178
10.3
Coulter array lighting ........................................................................................................... 179
10.4
Moving the implement from transport into working position ................................................ 179
10.5
Work commencement ......................................................................................................... 179
10.6
During operation .................................................................................................................. 181
10.6.1
Overview of checks during operation .................................................................................. 181
10.6.2
Turning at end of the field ................................................................................................... 182
10.6.3
Track marker ....................................................................................................................... 183
10.6.4
End of work on the field ....................................................................................................... 184
10.7
Emptying the seed hopper and seed housing ..................................................................... 185
11
Faults ........................................................................................................ 189
11.1
Residual seed quantity display ............................................................................................ 190
11.2
Deviations between the set and actual seed rate ............................................................... 190
12
Maintenance and repairs ........................................................................ 191
12.1
Maintenance schedule ........................................................................................................ 191
12.2
Safety .................................................................................................................................. 193
12.2.1
Safety when cleaning the implement .................................................................................. 194
12.2.2
Safety when working on the hydraulic system .................................................................... 195
12.3
Repairs ................................................................................................................................ 196
12.3.1
Visual inspection of the upper and lower link pins .............................................................. 196
12.3.2
Visual check of the hydraulic hose lines and couplings ...................................................... 197
12.3.2.1
Date of manufacture of the hydraulic hose line ................................................................... 197
12.3.3
Check the chain tension ...................................................................................................... 198
12.3.4
Bottom flaps, check basic position ...................................................................................... 199
12.3.5
Vario gearbox, check the oil level ....................................................................................... 200
12.3.6
Checking / readjusting / replacing the TwinTeC roller scrape ............................................ 201
12.4
Opening the protective equipment ...................................................................................... 202
12.4.1
Open the function flap ......................................................................................................... 202
12.4.2
Opening the cover ............................................................................................................... 203
12.5
Installations ......................................................................................................................... 204
12.5.1
Shutdown of the implement over a long period of time ....................................................... 204
12.5.2
Adjusting the tramline control .............................................................................................. 205
12.5.2.1
Folding down the lay shaft .................................................................................................. 207
12.5.2.2
Folding up the lay shaft ....................................................................................................... 208
12.5.2.3
Setting the tramline track width ........................................................................................... 209
12.5.2.4
Setting the tramline wheelmark width ................................................................................. 210
12.5.2.5
Conversion of a metering wheel to a tramline metering wheel ........................................... 211
12.5.2.6
Conversion of a tramline metering wheel to a metering wheel ........................................... 213
12.5.2.7
Conversion of a tramline metering wheel to a metering wheel by shifting the gear
wheel on the lay shaft ......................................................................................................... 213
12.5.2.8
Conversion of a tramline metering wheel to a metering wheel by removing the gear
wheel pairing from the lay shaft and seeding shaft ............................................................. 214
12.5.3
Changing the metering wheel ............................................................................................. 215
12.5.3.1
Changing the metering wheel - Seeding shaft drive with star wheel .................................. 215
Содержание Cataya 3000 Special
Страница 2: ......
Страница 39: ...Product description Cataya Special BAH0109 1 02 21 39 Fig 9 Cataya 3000 Super mounted on CombiDisc 3000 ...
Страница 99: ...Structure and function Cataya Special BAH0109 1 02 21 99 Fig 107 ...
Страница 240: ...Hydraulic diagram 240 Cataya Special BAH0109 1 02 21 Fig 321 ...
Страница 241: ......
Страница 242: ......