![Amazone Cataya 3000 Special Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/amazone/cataya-3000-special/cataya-3000-special_operating-manual_2919710036.webp)
Loading and unloading the implement upon delivery
36
Cataya Special BAH0109-1 02.21
Only load the pack top seed drill when it is
mounted on the soil tillage implement and the
roller.
For loading with a crane, select the length of the
sling so that there is no chance of the sling mak-
ing contact, in particular with the seed hopper or
the cover of the seed hopper.
Fig. 4
Required rope lengths:
Rope at the front (Fig. 4/1): 3000 mm
Rope at the rear (Fig. 4/2):
2500 mm
Fasten the
2 slings on the marked fastening points
(Fig. 5/1) on the pack top seed drill.
1 sling on the upper coupling point (Fig. 5/2)
of the soil tillage implement.
Secure the combination properly on the transport
vehicle.
Fig. 5
Содержание Cataya 3000 Special
Страница 2: ......
Страница 39: ...Product description Cataya Special BAH0109 1 02 21 39 Fig 9 Cataya 3000 Super mounted on CombiDisc 3000 ...
Страница 99: ...Structure and function Cataya Special BAH0109 1 02 21 99 Fig 107 ...
Страница 240: ...Hydraulic diagram 240 Cataya Special BAH0109 1 02 21 Fig 321 ...
Страница 241: ......
Страница 242: ......