![Amazone Cataya 3000 Special Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/amazone/cataya-3000-special/cataya-3000-special_operating-manual_2919710007.webp)
Cataya Special BAH0109-1 02.21
7
6.1.1.5
Calculation of the actual rear axle load of the tractor T
H tat
.................................................. 108
6.1.1.6
Load-bearing capacity of the tractor tyres ........................................................................... 108
6.1.1.7
Table .................................................................................................................................... 109
6.2
Secure the tractor / implement against unintentional starting and rolling away ................. 110
7
Coupling and uncoupling the implement .............................................. 111
7.1
Hydraulic hose lines ............................................................................................................. 113
7.1.1
Coupling the hydraulic hose lines ........................................................................................ 113
7.1.2
Disconnecting the hydraulic hose lines ................................................................................ 114
7.2
Coupling and uncoupling implements .................................................................................. 115
7.2.1
Coupling - Tractor and soil tillage implement ....................................................................... 117
7.3
Coupling - Pack top seed drill and soil tillage implement .................................................... 118
7.3.1
Uncoupling – Combination from the tractor ......................................................................... 123
7.3.2
Uncoupling – Soil tillage implement and pack top seed drill ................................................ 124
7.4
Checking the tramline track width ........................................................................................ 128
7.5
Checking the tramline wheelmark width .............................................................................. 128
8
Settings ..................................................................................................... 129
8.1
Folding the steps up and down ............................................................................................ 130
8.2
Fill the seed hopper ............................................................................................................. 132
8.3
Adjusting the implement to type of seed .............................................................................. 137
8.3.1
Bottom flap position ............................................................................................................. 137
8.3.2
Sliding shutter position ......................................................................................................... 138
8.3.3
Agitator shaft support ........................................................................................................... 139
8.3.3.1
Agitator shaft support (implements with star wheel drive) ................................................... 139
8.3.3.2
Agitator shaft support (implements with electric metering drive) ......................................... 140
8.4
Calibrating the seed rate ...................................................................................................... 141
8.4.1
Calibrating the seed rate - implements with star wheel drive .............................................. 145
8.4.1.1
Preparing the implement for calibration ............................................................................... 145
8.4.1.2
Pre-calibrating the implement .............................................................................................. 146
8.4.1.3
Calibrating the seed rate ...................................................................................................... 147
8.4.1.4
Determining the gearbox setting using the calculating disc rule .......................................... 149
8.4.2
Calibrating the seed rate - Implements with AmaDrill 2 control terminal or
Implements with ISOBUS system ........................................................................................ 150
8.4.3
Adjusting the automatic seed rate increase ......................................................................... 151
8.5
Star wheel – Working and transport position ....................................................................... 152
8.6
RoTeC Control coulter ......................................................................................................... 153
8.6.1
Adjusting and checking the seed placement depth ............................................................. 153
8.6.1.1
Adjusting the depth control discs / wheels ........................................................................... 154
8.7
Attaching the band seeding shoe to the WS coulter ............................................................ 155
8.8
Coulter pressure - RoTeC and WS coulter .......................................................................... 156
8.8.1
Coulter pressure adjustment (manual adjustment) .............................................................. 156
8.8.2
Coulter pressure adjustment (hydraulic adjustment) ........................................................... 157
8.9
TwinTeC double disc coulter ................................................................................................ 158
8.9.1
Adjusting and checking the seed placement depth ............................................................. 158
8.9.2
Adjusting the TwinTeC harrow tines .................................................................................... 158
8.9.3
Coulter pressure (manually actuated) .................................................................................. 161
8.10
Adjusting the exact following harrow ................................................................................... 162
8.10.1
Adjusting the exact following harrow tines by rebolting the brackets .................................. 162
8.10.2
Infinitely variable adjustment of the exact following harrow tines ........................................ 162
8.10.3
Setting the exact following harrow pressure ........................................................................ 163
8.10.4
Moving the exact following harrow to the working/transport position .................................. 164
8.10.4.1
Move the exact following harrow into working position ........................................................ 164
8.10.4.2
Moving the exact following harrow into transport position ................................................... 164
8.11
Moving the track marker to the working / transport position ................................................ 165
8.12
One-sided switching ............................................................................................................. 166
8.13
Moving the tramline marker into working/transport position ................................................ 167
8.13.1
Move the tramline marker to working position ..................................................................... 167
8.13.2
Move the tramline markers to the transport position............................................................ 168
Содержание Cataya 3000 Special
Страница 2: ......
Страница 39: ...Product description Cataya Special BAH0109 1 02 21 39 Fig 9 Cataya 3000 Super mounted on CombiDisc 3000 ...
Страница 99: ...Structure and function Cataya Special BAH0109 1 02 21 99 Fig 107 ...
Страница 240: ...Hydraulic diagram 240 Cataya Special BAH0109 1 02 21 Fig 321 ...
Страница 241: ......
Страница 242: ......