40
HT 6Split
HT 12Split
Menu 5 - SERVICE
Chapter 9 |
Control
5 - SERVICE
5.1 - operating settings
5.1.1 - hot water settings
6
5.1.2 - max flow line temperature
5.1.3 - max diff flow line temp.
5.1.4 - alarm actions
5.1.5 - fan sp. exhaust air
7
5.1.6 - fan sp. supply air
7
5.1.12 - addition
5.1.14 - flow set. climate system
5.1.22 - heat pump testing
5.1.23 - compressor curve
5.1.25 - time filter alarm
5.2 - system settings
5.2.2 - installed slaves
5.2.3 - docking
5.2.4 - accessories
5.3 - accessory settings
5.3.2 - shunt controlled add. heat
5.3.3 - extra climate system
8
5.3.4 - solar heating
9
5.3.6 - step controlled add. heat
5.3.8 - hot water comfort
6
5.3.11 - modbus
10
5.3.12 - exhaust/supply air module
7
5.3.14 - F135
11
5.3.15 - GBM communications module
12
5.3.16 - humidity sensor
13
5.3.21 - flow sensor / energy meter
14
5.4 - soft in/outputs
5.5 - factory setting service
5.6 - forced control
5.7 - start guide
5.8 - quick start
5.9 - floor drying function
5.10 - change log
5.11 - slave settings
5.11.1 - EB101
5.11.1.1 - heat pump
5.11.1.2 - charge pump (GP12)
5.11.2 - EB102
5.11.3 - EB103
5.11.4 - EB104
5.11.5 - EB105
5.11.6 - EB106
5.11.7 - EB107
5.11.8 - EB108
5.12 - country
6
The EP Split
additional equipment is necessary.
7
The
additional equipment is necessary.
8
The
additional equipment is necessary.
9
The
additional equipment is necessary.
10
The Modbus Split
additional equipment is necessary.
11
The
additional equipment is necessary.
12
The
additional equipment is necessary.
13
The
additional equipment is necessary.
14
The
additional equipment is necessary.
Содержание HT 12Split
Страница 2: ......
Страница 80: ...ait deutschland GmbH Industriestra e 3 D 95359 Kasendorf www ait deutschland eu EN...