6
HT 6Split
HT 12Split
2 Supply and operation
Transport
Included items
Assembly
HT 6Split / HT 12Split heat pump must be transported
and stored vertically in a dry place. HT 6Split / HT 12Split
can be, however, carefully placed on the rear side of the
casing when carrying the device into the building.
Leave 800 mm free space at the front of the heat
pump. All maintenance works on HT 6Split / HT
12Split can be done from the front.
The side covers and rear wall of the housing are per-
manently attached, therefore it is not possible to dis-
mantle them.
•
HT 6Split / HT 12Split must be set on a solid wa-
terproof base that would keep the weight of the
indoor unit. The regulated legs of the heat pump
allow for levelling and stable setting of the device.
•
Because HT 6Split / HT 12Split is equipped with
condensate drain, indoor unit installation site must
be furnished with a fl oor drain with a discharge to
the sewer system.
1. Remove screws at the bottom edge of the front cover.
2. Open the cover at the lower edge, taking care to
not damage the connecting cables, and then re-
move the front cover by lifting it up.
3. Disconnect the cable connecting the front cover
to the unit.
Installation site
Removal of the covers
3
Chapter 2 |
Supply and operation
20-40 mm
Wrench size 13
IMPORTANT
When using an additional heat source, leave behind
the device the space necessary for non trouble free
connections and subsequent maintenance.
25-30 mm
800 mm
IMPORTANT
The opening pressure of the safety valve is 3 bar.
Safety group with safety
valve (3 bar), pressure
gauge and automatic air
vent (1 pc.)
Temperature sensor
Outdoor and indoor
(2 pcs)
Connection p.28
Current sensor (3 pcs)
Connection p.28
230V connection
jumper (1 pc.)
LEK
LEK
LEK
Содержание HT 12Split
Страница 2: ......
Страница 80: ...ait deutschland GmbH Industriestra e 3 D 95359 Kasendorf www ait deutschland eu EN...