Contents
6
10Gbps SFP+ Transceiver Slots ................................................................................................................................. 50
40/100Gbps Transceiver Slots .................................................................................................................................... 53
Optional XEM2 Line Cards .......................................................................................................................................... 55
Additional Guidelines ................................................................................................................................................... 58
Switch ID Numbers ............................................................................................................................................................. 60
Optional Feature Licenses .................................................................................................................................................. 61
Chapter 3: Beginning the Installation
............................................................................................................................ 63
Reviewing Safety Precautions ............................................................................................................................................ 64
Installation Options ............................................................................................................................................................. 69
Choosing a Site for the Chassis.......................................................................................................................................... 70
Unpacking the Switch ......................................................................................................................................................... 71
Verifying the Accessory Kit ................................................................................................................................................. 75
Unpacking the AT-PWR600 AC Power Supply................................................................................................................... 77
Chapter 4: Installing Power Supplies and Optional XEM2 Line Card
......................................................................... 81
Installing PWR600 AC Power Supplies .............................................................................................................................. 82
Installing an Optional XEM2 Ethernet Line Card ................................................................................................................ 86
Chapter 5: Installing the Switch on a Table
................................................................................................................... 91
Chapter 6: Installing the Switch in an Equipment Rack
............................................................................................... 95
Removing the Bumper Feet ................................................................................................................................................ 98
Installing the Switch ............................................................................................................................................................ 99
Chapter 7: Installing the Switch on a Wall
................................................................................................................... 103
Switch Orientations on a Wall ........................................................................................................................................... 104
Recommended Minimum Wall Area Dimensions.............................................................................................................. 105
Plywood Base for a Wall with Wooden Studs ................................................................................................................... 107
Installation Guidelines....................................................................................................................................................... 109
Installing the Plywood Base .............................................................................................................................................. 111
Installing the Switch on the Plywood Base ....................................................................................................................... 112
Installing the Switch on a Concrete Wall........................................................................................................................... 115
Chapter 8: Configuring Switches for Stacking
........................................................................................................... 119
Introduction ....................................................................................................................................................................... 120
Command Summary ......................................................................................................................................................... 121
PLATFORM PORTMODE INTERFACE .................................................................................................................... 121
STACKPORT............................................................................................................................................................. 122
STACK ENABLE ....................................................................................................................................................... 122
STACK PRIORITY..................................................................................................................................................... 122
STACK RENUMBER ................................................................................................................................................. 123
SWITCH PROVISION................................................................................................................................................ 123
Powering On a Switch....................................................................................................................................................... 124
Starting a Local Management Session ............................................................................................................................. 127
Configuring the Master Switch .......................................................................................................................................... 129
General Steps for the Master Switch ......................................................................................................................... 129
Configuring the Master Switch................................................................................................................................... 130
Verifying the Master Switch ....................................................................................................................................... 133
What to Do Next ........................................................................................................................................................ 134
General Steps for the Member Switch....................................................................................................................... 136
Configuring the Member Switch - Part I..................................................................................................................... 137
Configuring the Member Switch - Part II.................................................................................................................... 139
Verifying the Member Switch ..................................................................................................................................... 141
What to Do Next ........................................................................................................................................................ 142
Содержание AT-x950-28XSQ
Страница 8: ...Contents 8 ...
Страница 12: ...Tables 12 ...
Страница 16: ...Preface 16 ...
Страница 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Страница 80: ...Chapter 3 Beginning the Installation 80 ...
Страница 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Страница 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Страница 106: ...Chapter 7 Installing the Switch on a Wall 106 Figure 67 Minimum Wall Area Dimensions with the Front Panel on the Right ...
Страница 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Страница 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Страница 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Страница 164: ...Chapter 10 Replacing Modules 164 Figure 94 Tightening the Two Screws on the Line Card Blank Panel ...
Страница 169: ...AT x950 28XSQ Switch and VCStack Installation Guide 169 Figure 100 Installing the Blank Power Supply Cover ...
Страница 180: ...Chapter 11 Troubleshooting 180 ...
Страница 190: ...Appendix A Technical Specifications 190 ...