AT-x950-28XSQ Switch and VCStack Installation Guide
7
Powering on the Stack.......................................................................................................................................................144
Verifying the Stack.............................................................................................................................................................145
Chapter 9: Cabling the Networking Ports
.................................................................................................................... 147
Cabling 1Gbps and 10Gbps Twister Pair Ports .................................................................................................................148
Guidelines to Handling Twisted Pair or Fiber Optic Transceivers .....................................................................................149
Installing Transceivers .......................................................................................................................................................150
Installing Direct Attach Cables...........................................................................................................................................156
Chapter 10: Replacing Modules
................................................................................................................................... 159
Replacing XEM2 Ethernet Line Cards ...............................................................................................................................160
Replacing PWR600 AC Power Supplies ...........................................................................................................................165
Replacing FAN05 Modules ................................................................................................................................................170
Removing Fan Modules .............................................................................................................................................170
Installing Fan Modules ...............................................................................................................................................172
Chapter 11: Troubleshooting
........................................................................................................................................ 175
Appendix A: Technical Specifications
......................................................................................................................... 181
Physical Specifications ......................................................................................................................................................182
Environmental Specifications.............................................................................................................................................184
Power Specifications .........................................................................................................................................................185
Certifications ......................................................................................................................................................................187
RJ-45 Twisted Pair Port Pinouts on the AT-XEM2-12XT Card..........................................................................................188
RJ-45 Style Serial Console Port Pinouts ...........................................................................................................................189
Содержание AT-x950-28XSQ
Страница 8: ...Contents 8 ...
Страница 12: ...Tables 12 ...
Страница 16: ...Preface 16 ...
Страница 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Страница 80: ...Chapter 3 Beginning the Installation 80 ...
Страница 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Страница 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Страница 106: ...Chapter 7 Installing the Switch on a Wall 106 Figure 67 Minimum Wall Area Dimensions with the Front Panel on the Right ...
Страница 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Страница 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Страница 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Страница 164: ...Chapter 10 Replacing Modules 164 Figure 94 Tightening the Two Screws on the Line Card Blank Panel ...
Страница 169: ...AT x950 28XSQ Switch and VCStack Installation Guide 169 Figure 100 Installing the Blank Power Supply Cover ...
Страница 180: ...Chapter 11 Troubleshooting 180 ...
Страница 190: ...Appendix A Technical Specifications 190 ...