9
Figure 1: Front Panel of the AT-x950-28XSQ Switch ........................................................................................................... 18
Figure 2: Rear Panel of the AT-x950-28XSQ Switch............................................................................................................ 18
Figure 3: Link and Activity LEDs for Ports 1 to 24 ................................................................................................................ 21
Figure 4: QSFP-4SFP10G-3CU or QSFP-4SFP10G-5CU Copper Breakout Cable ............................................................ 23
Figure 5: ET3-MPO08-4LC-5 or ET3-MPO08-4LC-10 Fiber Optic Breakout Cable ............................................................. 24
Figure 6: LEDs for Ports 25 to 37 ......................................................................................................................................... 24
Figure 7: XEM2 Series Ethernet Line Cards......................................................................................................................... 27
Figure 8: XEM2-12XT Line Card .......................................................................................................................................... 28
Figure 9: XEM2-12XS Line Card .......................................................................................................................................... 30
Figure 10: XEM2-4QS Line Card.......................................................................................................................................... 32
Figure 11: XEM2-1CQ Line Card.......................................................................................................................................... 34
Figure 12: Management Panel ............................................................................................................................................. 36
Figure 13: Switch ID LED with the eco-friendly Mode Disabled ........................................................................................... 39
Figure 14: Switch ID LED with the eco-friendly Mode Enabled ............................................................................................39
Figure 15: AT-PWR600 Power Supply ................................................................................................................................. 42
Figure 16: AT-FAN05 Fan Module........................................................................................................................................ 44
Figure 17: PORT Parameter in the Command Line Interface............................................................................................... 45
Figure 18: Slot Numbers for Port Numbering on Stand-alone Switches............................................................................... 45
Figure 19: Base 10Gbps Transceiver Slots .......................................................................................................................... 50
Figure 20: Stack Trunk of Four 10Gbps Links of SFP+ Transceivers in the Base 10Gbps Slots......................................... 51
Figure 21: Invalid 10Gbps Trunk of Only One Link............................................................................................................... 52
Figure 22: Invalid 10Gbps Trunk with Both Fiber Optic Transceivers and AT-SP10TW Direct Attach Cable ...................... 52
Figure 23: Invalid Trunk with Both 10Gbps Transceivers and 40Gbps or 100Gbps Transceivers ....................................... 52
Figure 24: Invalid Trunk of 10Gbps Transceivers in Base Slots and AT-XEM2-12XS Line Card......................................... 53
Figure 25: Base 40Gbps or 100Gbps Transceiver Slots ...................................................................................................... 53
Figure 26: Stack Trunk of Four 40Gbps Links ...................................................................................................................... 54
Figure 27: Stack Trunk of Two 100Gbps Links..................................................................................................................... 54
Figure 28: Invalid Trunk with Links Operating at 40Gbps and 100Gbps ..............................................................................54
Figure 29: Invalid Trunk with Both Fiber Optic and Direct Attach Cables............................................................................. 55
Figure 30: Invalid Trunk with a 10Gbps Breakout Cable ...................................................................................................... 55
Figure 31: Example of a Stack Trunk Using AT-XEM2-12XT Line Cards ............................................................................ 56
Figure 32: Example of a Stack Trunk Using AT-XEM2-4QS Line Cards..............................................................................56
Figure 33: Invalid Stack Trunk of Transceivers in AT-XEM2-12XS Line Card and 10Gbps Base Slots............................... 57
Figure 34: Invalid 100Gbps Stack Trunk of Base 100Gbps Slots and AT-XEM2-1CQ Line Cards ...................................... 57
Figure 35: Not Recommended Stack Trunk Using AT-XEM2-1CQ Line Cards.................................................................... 57
Figure 36: Invalid Trunk with Intervening Network Devices.................................................................................................. 58
Figure 37: Installation Options .............................................................................................................................................. 69
Figure 38: Removing Accessories ........................................................................................................................................ 71
Figure 39: Removing the Shipping Partition ......................................................................................................................... 72
Figure 40: Lifting the Switch from the Shipping Box ............................................................................................................. 73
Figure 41: Removing the Switch from the Shipping End-caps and Protective Bag .............................................................. 73
Figure 42: Accessory Kit....................................................................................................................................................... 75
Figure 43: Removing the Power Cord and Documents from the AT-PWR600 AC Power Supply........................................ 77
Figure 44: Removing the Partition from the AT-PWR600 AC Power Supply Shipping Box ................................................. 78
Figure 45: Removing the Power Supply from the Shipping Box........................................................................................... 79
Figure 46: Removing the Power Supply from the Shipping End-caps and Protective Bag ..................................................79
Figure 47: Removing the Blank Power Supply Panel from Slot PSU B................................................................................ 83
Figure 48: Sliding the PWR600 AC Power Supply into the Switch....................................................................................... 84
Figure 49: Seating the Power Supply on the Internal Connector.......................................................................................... 85
Figures
Содержание AT-x950-28XSQ
Страница 8: ...Contents 8 ...
Страница 12: ...Tables 12 ...
Страница 16: ...Preface 16 ...
Страница 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Страница 80: ...Chapter 3 Beginning the Installation 80 ...
Страница 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Страница 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Страница 106: ...Chapter 7 Installing the Switch on a Wall 106 Figure 67 Minimum Wall Area Dimensions with the Front Panel on the Right ...
Страница 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Страница 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Страница 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Страница 164: ...Chapter 10 Replacing Modules 164 Figure 94 Tightening the Two Screws on the Line Card Blank Panel ...
Страница 169: ...AT x950 28XSQ Switch and VCStack Installation Guide 169 Figure 100 Installing the Blank Power Supply Cover ...
Страница 180: ...Chapter 11 Troubleshooting 180 ...
Страница 190: ...Appendix A Technical Specifications 190 ...