Chapter 1: Overview
20
Management
Software and
Interfaces
Here are the management software and interfaces:
AlliedWare Plus management software.
Command line interface, available locally through the Console port
or remotely over the network.
Web browser interface available remotely over the network.
The AlliedWare Plus management software comes pre-installed on the
switch.
Management
Methods
You can manage the switch as follows:
Command line interface accessed locally through the Console port
or remotely using Telnet or Secure Shell.
Remote access using the web browser interface and HTTP.
Remote access with SNMPv1, v2c, or v3.
Management
Panel
The pre-installed management panel has the following features:
Console RS-232 port for local management (no IP address
required),
USB 2.0 port for storing backup copies of system configuration
files, updating management software, and other management
functions.
An eco-friendly button for turning off the port and system LEDs to
reduce power consumption.
Network management port for initial configuration and
maintenance access to the chassis.
Power Supplies
The switch has slots for two power supplies on the back panel. The switch
can be powered by a single power supply. Adding a second power supply
provides power redundancy. Power supplies are ordered separately.
Refer to “AT-PWR600 Power Supply” on page 42.
Содержание AT-x950-28XSQ
Страница 8: ...Contents 8 ...
Страница 12: ...Tables 12 ...
Страница 16: ...Preface 16 ...
Страница 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Страница 80: ...Chapter 3 Beginning the Installation 80 ...
Страница 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Страница 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Страница 106: ...Chapter 7 Installing the Switch on a Wall 106 Figure 67 Minimum Wall Area Dimensions with the Front Panel on the Right ...
Страница 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Страница 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Страница 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Страница 164: ...Chapter 10 Replacing Modules 164 Figure 94 Tightening the Two Screws on the Line Card Blank Panel ...
Страница 169: ...AT x950 28XSQ Switch and VCStack Installation Guide 169 Figure 100 Installing the Blank Power Supply Cover ...
Страница 180: ...Chapter 11 Troubleshooting 180 ...
Страница 190: ...Appendix A Technical Specifications 190 ...